Skip to content
All case studies
Hospitality

Soho Hotel: 14.3% less energy per guest load

Denka® Platinum in a downtown Amman hotel — lower consumption per point of occupancy while guest numbers rose by a third.

Denka® Platinum was installed at Soho Hotel in downtown Amman before August 2026. Three full months were compared with the same months of 2025, normalised for occupancy and weather, while occupancy rose by about a third year-on-year.

Results

  • 14.3% less electricity per point of occupancy over August–October 2026
  • 18.7% and 19.9% lower in September and October
  • Savings on variable loads of 7.8–8.6% after occupancy and weather normalisation
  • Occupancy up from 41% to 55% (September) and 49% to 65% (October)