PSF Plastic Factory: 192,837 kWh saved in one month

Preform and film production in Jeddah, across 13 transformers, in the hottest and most humid month of the year.

PSF’s preform and film divisions in Jeddah run on 13 transformers of 1,000 kVA. Before installation, consumption had drifted 14.6% above 2025 under Red Sea heat and humidity. Denka® was commissioned for September 2026, when production also rose 7.5%.

Results

  • 9.2% whole-facility savings in September 2026
  • 192,837 kWh avoided in a single month
  • 18.8% direct drop on the five most responsive film and preform sub-meters
  • Energy per kg fell from 1.927 to 1.876 kWh while output grew