Cet article n'est pas encore disponible dans votre langue. Version anglaise affichée.
16 projects, 9 countries: what Denka® Platinum results look like in practice
From cement in Egypt to a hospital in Colombia and plastics in Ecuador — a transparent look at measured Denka® Platinum results, including the modest ones.

Claims are easy. Measured results are harder — so here is the full picture from our published case studies, spanning 16 projects, 9 countries and 12 industries.
Headline result of each published project. Methods differ by site — see each case for its baseline and scope.
The range, honestly
- Strongest results: ARMCON ready-mix concrete in Bahrain (−17% electricity), Jaber Mall in Amman (−16.8%), FUPEL plastics in Ecuador (−16.1%).
- Typical results: PrintoPack packaging in Saudi Arabia (−11.7% production-adjusted), Al Zohour food plant (−11.0%), PSF plastics in Jeddah (−9.2%).
- Modest results: Hospital Santa Ana in Colombia, where a careful IPMVP Option C analysis estimates ≈3–4% over three post-installation months.
We publish the modest results alongside the strong ones because a credible range is more useful to a buyer than a single headline.
Why results differ
Savings depend on how much HF noise a site generates and where it flows. Plants dense with drives, inverters and switch-mode loads — cement mills, plastics extrusion, chillers — tend to show larger reductions than sites with lighter electronic loads. That is exactly why every engagement starts with a 5-step site diagnostic before a single plate is installed.
What stays the same
One product — the Black laser-engraved Denka® Platinum Plate — in every project. Typical reduction 8–15% in specific energy consumption across 100+ facilities, up to ~20% at select sites, verified on site.